Blog

High-Energy / Passive House 35m2.

It is an ecological house made on the basis of the STEICO wood fiber insulation system with a building area of up to 35 m2, usually on request, but adapted to be modulated in any configuration and number of modules.

Possibility to adapt the roof to local development plans (as a flat or 2-sloped roof). Each arrangement of internal walls can be adapted according to the customer’s needs. The rooms include one or two bedrooms, a bathroom (toilet, shower, washbasin, access to the washing machine), a living room with a kitchenette.

The price includes all construction documents needed to submit a building permit, such as: statics, drawings, sections, views.

High-Energy/Passive House up to 70m2

It is an ecological house made on the basis of the STEICO wood fiber insulation system with a construction area of up to 70m2 mostly on application.

The houses produced are strictly adapted to the customer’s needs in terms of the size of the usable area, number and layout of the rooms. Possibility to add a garage or utility / technical room.

Possibility of adapting the roof to local development plans (as an envelope or 2-pitch roof). The rooms include one, two or three bedrooms, bathroom (toilet, shower sink, approach for washing machine), living room with kitchenette or as separate rooms.

It is possible to configure the house together with a terrace.

Included in the price are all the construction documents needed to submit a building permit, such as Statics, drawings, sections, views.

We provide high-quality installation and finishing services of manufactured homes in four price variants and degrees of finishing:

High-Energy/Passive House over 75m2.

This is an eco-friendly house made with the STEICO wood fiber insulation system with a construction area of more than 70m2. We build such a house only with a building permit.

The houses produced are strictly adapted to the customer’s needs in terms of the size of the usable area, number and layout of the rooms. Possibility to add a garage or utility / technical room.

The roof can be adapted to local development plans (as an envelope or 2-pitch roof, with or without dormers). The premises include several bedrooms, a bathroom or two (toilet, shower sink bidet, approach for washing machine), living room with kitchenette or as separate rooms.

It is possible to configure the house together with a terrace.

The price includes all construction documents needed to submit a building permit, such as: statics, drawings, sections, views.

We provide high-quality installation and finishing services of manufactured homes in four price variants and degrees of finishing:

Thermal modernization and insulation of masonry buildings

Diffusion openness, excellent thermal and acoustic performance. Steico insulation board and mat technology in the thermal rehabilitation of existing masonry buildings, as well as in new masonry construction.

When thermo-modernization or thermal insulation , depending on the condition of the walls, we use two methods to insulate the building:

1. straight walls of the building – depending on what thermal parameter we want to achieve we use Steico panels of a given thickness mounted directly to the building, just like standard insulation.

2. curved Walls of the building – In this case, consoles must be installed to the wall. The next step is to make a C24 timber frame, which is lined up perfectly, both vertically and horizontally. This results in a perfect plane, and thus a straight building wall.

The next step is to fill the frame with insulation mats and then with tongue-and-groove insulation board – once this board is used, thermal bridges are eliminated. Once this is done, we get a water- and wind-proof façade ready to be plastered or clad with façade board.

Both methods perform the same function – providing the best thermal performance, protecting the masonry from moisture, excellent microclimate, spontaneous drying of the walls due to the openness of diffusion.

Price – from 300,00 PLN/m2

Wooden frame – Self-assembly construction

House frame plus roof truss (PLN 1,200.00), which includes:

Construction of the frame house structure (exterior wall structure, interior wall structure, ceiling, roof structure, ceiling, floor).

All the planning documents you need to submit for a building permit or application.

Fastening parts such as nails, screws, dowels and carpentry fasteners.

Facilities / Halls

We also offer utility rooms/halls made with frame technology.

They are characterized by low energy requirements for heating the facility. With the right layers of insulation, such an object will reduce the bills by more than half during the heating season, and thus in the summer season will protect the object from overheating.

With low construction costs compared to traditional steel, our facility will be built in 2 weeks. Our buildings in no way differ from the steel ones in terms of static and strength parameters.

The use of appropriate fireproof cladding inside, in the required places, will meet all Fire Safety requirements. We build our buildings on standard foundations as well as on foundation slabs, depending on the purpose.

Healthy microclimate and openness to diffusion makes the object will serve for generations without fear of any moisture and wood rot, and at the same time will make the comfort of use like at home. Quality guarantee on the tightness of roof, walls and the life span of 15 years with the possibility of extension for another 15 years.

It is ideal for people who want to quickly and cheaply build a utility room, car workshop, carpenter’s store, store, wholesale. The facilities are also widely used in the construction of schools, kindergartens, office buildings. We are able to build buildings of any size and up to 4m high.

Price: From 1.400,00 PLN/m2 for closed state

From PLN 1,800.00 per square meter for shell units

To top